Time is Money: How Premier Construction Software Can Save You Both

While a project can take months or years to complete, the reality is that construction moves fast. A company that knows time is money and knows how to make the most of both is on the path to success.  Premier Construction Software can help with time and money, and in this guide, we’ll discuss how it can save your company both. 

How Premier Can Save Time and Money

Would you put trust in a software program that can save your business both time and money? It seems like a no-brainer. That’s what our construction ERP solution was designed to do, and the following features or abilities are just some of the ways that Premier can impact your company.

Automated Processes

All of the data entry, report creation, and updating required to keep a construction business on track requires a lot of time. One of the most significant benefits of using Premier Construction Software is its ability to automate processes. 

When a user inputs or changes a value in the system, the software knows to update every related value affected by the change without a person having to track down the specific pay app, change order, or report.

One-click updates might seem the big time and money saver here, but consider this: Updating reports and budgets manually introduces multiple opportunities for human error. The time it takes to realize there is a mistake, track it down, and change it can be tremendous. And, should that mistake affect the project, it may translate to real money wasted. 

Customizable Workflows

The amount of time it takes to get a document, budget transfer, or change order in front of all the people that need to see it is often time wasted. With customizable workflows, users can design a free-flowing system that automatically moves important documents from person to person.

Ultimately, these custom-designed workflows ensure that important documents or changes make it through all of the required stops faster. Whether these documents need approvals, modifications, or updates, the company will receive feedback in less time using automated workflows.

Cloud-Based Storage

Upgrading document and drawing storage is a great way to save time and money. While most construction companies have evolved away from running to the shop every day for the latest revisions, their access to these documents is still antiquated and slow. 

For example, loading drawings onto a drive and then having to access those drawings with a computer is slow. Or, attempting to send large files through email only to have it take forever. And what if that drawing wasn’t the most updated version? Or just the older version the other party was looking for?

With cloud-based storage, contractors can move past those old, slow document management solutions. Premier Construction Software allows users to access the cloud for documents, drawings, photos, pay applications, and more from any internet-enabled device. It’s one of the fastest ways to share information with a team, and it can save time and money right away.

Report Generation

No one wants to blow that meeting in front of the investors or stakeholders, but time spent compiling data for a custom report may be a waste. Premier has the ability to automatically generate important reports with the very latest updates, as well. 

Not only are these reports easy to generate, but they take into account all of the most up-to-date information. Rather than stressing out about that report all week, it’s possible to simply click a button to create a report that’s not only instantaneous but also more accurate than anything you could compile.

Electronic Signatures

The construction world runs on agreements and signatures. Waiting to get those signatures on a paper agreement takes lifetimes (or at least it feels that way). The documents either need to be sent via courier or downloaded, printed, and sent back. Or, the agreement has to wait until a meeting can be scheduled for everyone to review the documents together before anyone can sign anything.

With electronic signatures, this entire process can take a fraction of the time. Documents can be sent electronically, which recipients can open from any internet-enabled device. Once they’ve reviewed the contract, change order, proposal, RFI, pay application, or any of the many compatible docs, they can sign electronically. This instantly updates the status in the system, cutting down on data entry or errors, and saving time and money.

Subcontractor Management

Minimizing the amount of time spent collecting lien waivers, monitoring compliance, calculating payment retainage, and ensuring everyone gets paid costs contractors and project managers lots of valuable time. But with a construction ERP like Premier, which is designed to make subcontractor management easier, users can save time and money.

For instance, Premier can track licensing and insurance compliance documents and alert the users and sub to possible expiration. It can also automatically generate subcontractor agreements and change orders instantly and ensure that those documents make it to the sub for an electronic signature. It’s also easy to set up automatic retainage for each payment, as well as distribute payments automatically (and accurately) by setting up pay-when-paid AP. 

Premier is All About Strengthening Your Business

Premier Construction Software’s goal is to strengthen your business using simplicity and automation. This means less time spent doing the remedial tasks that are always prone to error. When you’re not paying them to handle these tasks, you’re saving money and freeing them up to be creative and focus on projects that create more revenue for your business—and that’s a recipe for success. 

Categories
Accounting Industry Insight

Understanding Change Orders in Construction

Every company sees change orders slightly differently. Some see them as a time and resource vacuum, while others see them as opportunities to make more money. And the fact that there are many different outlooks on the subject makes truly understanding change orders in construction and the impacts they have a challenge. In this guide, we’ll take a look at these important documents, what they are, and how to manage them.

What is a Change Order?

A change order is a document used to modify the original contract on a construction project. These documents detail changes in the scope of work for the contractor as well as any adjustments to the amount of money the contractor will make on a project. They’re essentially miniature contracts (sometimes with not-so-miniature impacts) that steer the project after the original contract is awarded.

For example, let’s say a contractor won a bid to build an apartment building with eight identical apartments inside. At some point during the project, the project owner realizes that the bathrooms could benefit from half-walls alongside the toilets. The project owner will approach the contractor, they’ll discuss the details, and the contractor (or project owner) will draw up a change order that states the contractor will build half-walls in the bathroom for an agreed-upon price. It’s simply a contract within a contract that denotes a change in plan, materials, or pricing. 

Change Orders for Additional Work

Change orders for additional work require more time and resources. For that reason, these change orders will increase the total cost of the project, as well as extend the timeline. Impacted contractors must ensure that the change order reflects these changes to avoid issues when dealing with these types of change orders.

Change Order for Subtractions

Change orders that omit certain aspects of the agreed-upon original contract have the opposite impact on the cost and timeline. Under these change orders, project owners and GCs may expect the price and timeline to decrease. 

What Causes Change Orders?

Change orders can be caused by project owners, designers, inspectors, contractors, material suppliers, and many other possibilities. 

  • Project owners can change their minds about the budget. 
  • Designers can add design elements or colour changes. Inspectors may notice code issues that require the designer to go back to the drawing board. 
  • Contractors might not be able to do the job for the agreed-upon due to unforeseen circumstances or site conditions. 
  • Suppliers might not be able to get the chosen material.

Any one of these situations would alter the original plan. They could impact the budget or the timeline, and these changes need to be documented and agreed upon with the parties responsible for the changes. How these changes impact the project depends on what they involve.

Change Order Protect Contract Parties

Change orders can be a headache to manage, but they protect contracted parties. These documents take modifications in the course of the project and turn them into clearly-understood directives with legal backing.  

Contractors know that once they have a change order, they can move forward with the project without fear that they’ll be breaching the contract. They also know that if the project owner or designer adds something, they can adjust the timeline or project price and that they’ll have lien rights if they don’t get paid. 

Project owners know that they can alter the contract to subtract an item or design element. This will likely lower the amount of money the contractor was expecting, but the document keeps the contractor from suing or placing a lien on the project for non-payment. 

How to Manage Change Orders

Managing change orders is the most difficult aspect of these documents. Knowing how they’ll impact the budget and timeline, getting the correct signatures, communicating changes to stakeholders, and changing everything in the system at one time are all difficult tasks to coordinate. 

Budget Impacts

Change orders can cause ripple effects on a project budget. For example, if a particular material isn’t available, but a more expensive item is, it’s important to know how much that will impact the project budget before moving forward.

With construction ERP software, many of the best programs offer customers a chance to see how the change would impact the budget in real time. These systems allow users to lock original estimates or shift budgets without permanent changes. This also makes communicating the change’s impact much easier. 

Timeline Overruns

Change orders are often to blame for the project running off track and behind schedule—whether it’s true or not. But, changes typically impact the timeline a little, as they usually mean more or less work. It’s knowing how much it will throw the timeline off track that makes a difference, and the change order should reflect it. 

A construction ERP can help determine how much of an impact the change order will have on scheduling and the project delivery date. This can help the project owner decide if changing the timeline is worth the cost.

Getting Approvals

Getting approvals and signatures is always a challenging aspect of construction, and change orders are no different. Ensuring that the right eyes are seeing the change order and then get their signature can seem impossible.

A construction ERP can simplify this issue. By setting up automated workflow and capturing electronic signatures, the change order process moves along faster, saving time and money. Users can access the system from any internet-enabled device in the world.

Automated Changes

Once all of the approvals and signatures are secured it’s time to make the actual changes. Entering the change orders into whatever accounting software program the company uses is all the opportunity that’s required for multiple data entry-related issues like human error, accuracy, and a lack of thoroughness.

The right construction ERP software can handle this challenge, making automatic changes to every line item affected by the change order. With the click of a button, the changes will ripple through the entire system, automatically updating budgets, billing amounts and timelines, and more. 

All without manual data entry.

Communicating Changes

Communicating changes to the contract to company stakeholders requires data and reports. They want to know what’s changing, how it’s affecting the project delivery, and how much it’s going to cost the company.

Construction ERP software can handle those questions and more. With the ability to generate reports in real-time, project managers can provide stakeholders with the latest, most accurate information regarding these changes. 

Change Orders are Necessary, But They Require Management

Change orders are necessary, as almost all projects go through one change or another after signing the contract. But knowing how to manage these documents is important. By relying on the right program, like Premier Construction Software, contractors can minimize the negative impacts these documents have on their projects. And isn’t that what it’s all about?